|
|
|
|
|
Engineers Use TreeAge Pro to Reduce Risks and Ensure Cost-Effectiveness

Design challenges. Production risks. Construction alternatives. Every day, engineers face myriad decisions involving the allocation of limited company resources. For example:

> An engineer designing a manufacturing process must decide between two methodologies -
a familiar methodology which can be implemented readily and on schedule, or
a new, still experimental methodology which, if successful, would be considerably more efficient.
How can the engineer weigh the risks of using the new methodology against its potential benefits?

> A manufacturing company needs to reduce expenses related to product defects. Options include replacing all or part of the manufacturing process, implementing a test to warn of potentially defective products or implementing a more efficient means of dealing with warranty claims. How can the company determine which option will provide the best outcome?

> A railroad company wants to design a replacement program for ties, taking into account increasing risk of failure with age and traffic in order to determine the optimal time for replacement. How should the company proceed?

The Answer? Try a Better Process.
TreeAge Pro provides a systematic methodology and framework for optimizing decisions, helping engineers understand problems, identify available options and develop strategies which maximize the likelihood of success while minimizing unacceptable levels of risk.

Learn more about what TreeAge Pro can do for you. >